The projects I have been working on since Black Swan struct the world has been:
1. My master bedroom redo. That consisted of building another closet so that we had jack and Jill walk-in closets, then a new headboard, new matching side tables, and finally plugging off some windows, and installed a new patio door. Like the vanity, the furnishings in this room were san from the same tree as the vanity. (Completed)
2. Then it was off to putting in a new double vanity in our main bathroom. It was not too complex of a project, just redoing a wall with shiplap lumber instead of drywall, redoing some drains, and then making the new vanity. Interestingly, this was made from a dying pine tree on our own land, so from stump, to sawmill, to bathroom vanity. (Completed)
3. Then Katie wanted some new ducks and chickens, like 27 of them, so I had to build a new duck coop. This was pretty involved because it was from the ground up, 8 x 12 feet in size, a full size door, walls, windows, and a roof, and even has wiring inside. (Completed)
4. Then knowing I will bushog in a few months, I wanted to get that rebuilt, so I started on that last week. This is not a huge project so I needed other things to do while waiting for parts and stuff. (Still in process)
5. Thinking that the gravel pit had finally thawed out, and that I could start hauling gravel from my gravel pit to regravel my driveway, I started doing that. I di not expect to get 6 inches of snow yesterday, so that is now on hold for awhile, but I did manage to get a 40 cubic yard start on the project. When I get all done, I expect it will take around 250 cubic yards, so I have a long ways to go on that, but that is a job that I can do when the weather is nice outside. (Still in process)
6. I have been working on my back up generator for awhile, but really have got a lot done these last few months. It is a very long-term project, but is coming along nicely. We are a lot better off now then when we were a few weeks ago, so I am very pleased with how this job is turning out.