New garage time!

   / New garage time! #551  
I had those type of wood trusses on my first house.
 
   / New garage time! #552  
Curious as to the height of the wood joists vs. metal each spanning 24ft?

I bought direct from the factory. I was going to use a taller one, but they showed me a shorter one with a thicker web, that cost less and had same performance.
 
   / New garage time! #553  
I bought direct from the factory. I was going to use a taller one, but they showed me a shorter one with a thicker web, that cost less and had same performance.
Might be cheaper but I doubt the same performance all things considered. I-shaped cross section is the most efficient way to design simple engineered beam where bending strength is driving factor vs. shear strength (web strength). The web does relatively little to help with bending strength. Trusses are another level of strength, where instead of relying on the web for stability and shear loads, the truss members are instead compression/tension members but they generally take more vertical space to be efficient... a la roof trusses.

Sometimes space is a restriction requiring stronger materials or more efficient space for bending strengths... especially for long spans. Nowadays it is cheaper to manufacture a wood engineered I beam than a the raw material cost of say a 2x12 fir and can handle longer spans and are more stable.

Sorry for what might appear as a lecture here but I am guessing many don't understand why all the choices in joists.
 
   / New garage time!
  • Thread Starter
#554  
These are wood floor trusses...

View attachment 663453

Locally those are known as tri-force joists. We looked at 3, LVL's, i-joists, and tri-force joists. LVL's were $250 each, 12" on center and can't drill. i-joists had issues with the span and were about $130 each and couldn't get wet, tri-force the guy at the supply yard recommended against them saying alot of people complain of sagging after a period of time.

The tradeready joists were $4024.83 for 33x 24' which was $121.96 each, $376.90 for the 5 at 14'10" which is $75.38, 9 pieces of rim track 12' 12ga for $515.31 or $57.26 each.

With the steel joists it feels like I'm getting the strongest product for the lowest cost. The rim track is extra though.
 
   / New garage time! #555  
Those joist with OSB for the upright part and the little piece of pine for the web ( i joist ) suck IMO. There’s the yellow laminated beam that’s good stuff but it’s expensive.
 
   / New garage time! #556  
Locally those are known as tri-force joists. We looked at 3, LVL's, i-joists, and tri-force joists. LVL's were $250 each, 12" on center and can't drill. i-joists had issues with the span and were about $130 each and couldn't get wet, tri-force the guy at the supply yard recommended against them saying alot of people complain of sagging after a period of time.

The tradeready joists were $4024.83 for 33x 24' which was $121.96 each, $376.90 for the 5 at 14'10" which is $75.38, 9 pieces of rim track 12' 12ga for $515.31 or $57.26 each.

With the steel joists it feels like I'm getting the strongest product for the lowest cost. The rim track is extra though.

Amazing price differences.
 
   / New garage time! #557  
Locally those are known as tri-force joists. We looked at 3, LVL's, i-joists, and tri-force joists. LVL's were $250 each, 12" on center and can't drill. i-joists had issues with the span and were about $130 each and couldn't get wet, tri-force the guy at the supply yard recommended against them saying alot of people complain of sagging after a period of time.

The tradeready joists were $4024.83 for 33x 24' which was $121.96 each, $376.90 for the 5 at 14'10" which is $75.38, 9 pieces of rim track 12' 12ga for $515.31 or $57.26 each.

With the steel joists it feels like I'm getting the strongest product for the lowest cost. The rim track is extra though.

Are you going to have to use the self tapping screws from h*** for the sub floor?
 
   / New garage time!
  • Thread Starter
#558  
Are you going to have to use the self tapping screws from h*** for the sub floor?

I'm not sure what I'm doing for subfloor yet. The hex heads aren't going to work, I need a different self tapping screw which I don't have yet. I need to do bridging first though I think. Well, maybe not, if bridging pulls them out of 16" it would screw up my grid. It might be a good idea to put the plywood down first so I have everything in the correct position before I cut bridging.
 
   / New garage time! #559  
I'm not sure what I'm doing for subfloor yet. The hex heads aren't going to work, I need a different self tapping screw which I don't have yet. I need to do bridging first though I think. Well, maybe not, if bridging pulls them out of 16" it would screw up my grid. It might be a good idea to put the plywood down first so I have everything in the correct position before I cut bridging.

One would think the steel hoists would stay true while adding the subfloor. With wood or laminate joists, bridging would be first before the subfloor. Just a guess though....
 
   / New garage time! #560  

Tractor & Equipment Auctions

EZ-GO D499 Electric Golf Cart (A51694)
EZ-GO D499...
Danuser Digger F-8 (A52748)
Danuser Digger F-8...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
1999 Toyota Tacoma Pickup Truck (A50323)
1999 Toyota Tacoma...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
Ditch Witch 6510A Trencher - Deutz Diesel, Backhoe, Cable Plow, Front Blade (A52748)
Ditch Witch 6510A...
 
Top