New garage time!

   / New garage time! #911  
Kinda looks like noahs ark.
 
   / New garage time! #912  
Im having a 28x36 metal garage put up on concrete slab. Lumber prices dictated going metal .They are saying 12 wks min on delivery. waiting now on concrete, hope it warms back up a little.
 
   / New garage time!
  • Thread Starter
#913  
That's some serious work!!! Wonder what three stories would have been like?

Having to do it myself, I'm kind of glad it's only 2. I probably would have rented a boom truck to go any higher.
 
   / New garage time!
  • Thread Starter
#914  
Im having a 28x36 metal garage put up on concrete slab. Lumber prices dictated going metal .They are saying 12 wks min on delivery. waiting now on concrete, hope it warms back up a little.

Lumber prices are high. I'm going with metal on the outside. Lead time is only 4-6 days here. Wood I would guess will normalize in the next 2-3 months, basically by the time you get your metal. Plywood has dropped 5 bucks a sheet in the past week.
 
   / New garage time! #916  
Put some Gothic Windows on the second floor and make it look like a castle!

 
   / New garage time! #917  
Lumber prices are high. I'm going with metal on the outside. Lead time is only 4-6 days here. Wood I would guess will normalize in the next 2-3 months, basically by the time you get your metal. Plywood has dropped 5 bucks a sheet in the past week.

AB Martin in Ephrata had good numbers on the metal roofing when I bought mine for a shed roof. Same panels are good for walls or roof and are made to whatever length you want. Cost is per LF. No waste. Check out the ABM panels:

ABM Panel | Metal Roofing Panel from A.B. Martin Roofing Supply
 
   / New garage time! #918  
AB Martin in Ephrata had good numbers on the metal roofing when I bought mine for a shed roof. Same panels are good for walls or roof and are made to whatever length you want. Cost is per LF. No waste. Check out the ABM panels:

ABM Panel | Metal Roofing Panel from A.B. Martin Roofing Supply

Great company to deal with. When I needed white metal panels for the ceiling of my Morton building I used this company. They cut the panels to specific lengths that I had requested and had everything ready for pickup when I arrived to get them.
 
   / New garage time! #919  
Im having a 28x36 metal garage put up on concrete slab. Lumber prices dictated going metal .They are saying 12 wks min on delivery. waiting now on concrete, hope it warms back up a little.

Here's hoping you have good weather to get your building assembled. They don't take long if you have 2 or 3 guys that kinda know what they are doing.
 
   / New garage time! #920  
2x4s had come down to 6 bucks ,But now there back up to 8 . Couldnt afford to build a house now. Last yr my son built a house and his lumber bill was over 150,ooo. Cant imagine what it would be today.
 

Tractor & Equipment Auctions

Sunflower 1435-30 Cushion Flex Disc (A52349)
Sunflower 1435-30...
2015 CATERPILLAR AP1055F ASPHALT PAVER (A51242)
2015 CATERPILLAR...
2018 HINO 258 SERVICE TRUCK (A51243)
2018 HINO 258...
2023 New Holland Workmaster 25S Compact Tractor - Only 65 Hours (A52748)
2023 New Holland...
UNUSED FUTURE MINI SKID STEER HYD 12" AUGER (A51244)
UNUSED FUTURE MINI...
2013 Cadillac ATS Sedan (A50324)
2013 Cadillac ATS...
 
Top