New garage time!

   / New garage time! #911  
Kinda looks like noahs ark.
 
   / New garage time! #912  
Im having a 28x36 metal garage put up on concrete slab. Lumber prices dictated going metal .They are saying 12 wks min on delivery. waiting now on concrete, hope it warms back up a little.
 
   / New garage time!
  • Thread Starter
#913  
That's some serious work!!! Wonder what three stories would have been like?

Having to do it myself, I'm kind of glad it's only 2. I probably would have rented a boom truck to go any higher.
 
   / New garage time!
  • Thread Starter
#914  
Im having a 28x36 metal garage put up on concrete slab. Lumber prices dictated going metal .They are saying 12 wks min on delivery. waiting now on concrete, hope it warms back up a little.

Lumber prices are high. I'm going with metal on the outside. Lead time is only 4-6 days here. Wood I would guess will normalize in the next 2-3 months, basically by the time you get your metal. Plywood has dropped 5 bucks a sheet in the past week.
 
   / New garage time! #916  
Put some Gothic Windows on the second floor and make it look like a castle!

 
   / New garage time! #917  
Lumber prices are high. I'm going with metal on the outside. Lead time is only 4-6 days here. Wood I would guess will normalize in the next 2-3 months, basically by the time you get your metal. Plywood has dropped 5 bucks a sheet in the past week.

AB Martin in Ephrata had good numbers on the metal roofing when I bought mine for a shed roof. Same panels are good for walls or roof and are made to whatever length you want. Cost is per LF. No waste. Check out the ABM panels:

ABM Panel | Metal Roofing Panel from A.B. Martin Roofing Supply
 
   / New garage time! #918  
AB Martin in Ephrata had good numbers on the metal roofing when I bought mine for a shed roof. Same panels are good for walls or roof and are made to whatever length you want. Cost is per LF. No waste. Check out the ABM panels:

ABM Panel | Metal Roofing Panel from A.B. Martin Roofing Supply

Great company to deal with. When I needed white metal panels for the ceiling of my Morton building I used this company. They cut the panels to specific lengths that I had requested and had everything ready for pickup when I arrived to get them.
 
   / New garage time! #919  
Im having a 28x36 metal garage put up on concrete slab. Lumber prices dictated going metal .They are saying 12 wks min on delivery. waiting now on concrete, hope it warms back up a little.

Here's hoping you have good weather to get your building assembled. They don't take long if you have 2 or 3 guys that kinda know what they are doing.
 
   / New garage time! #920  
2x4s had come down to 6 bucks ,But now there back up to 8 . Couldnt afford to build a house now. Last yr my son built a house and his lumber bill was over 150,ooo. Cant imagine what it would be today.
 

Tractor & Equipment Auctions

2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
20711 (A50323)
20711 (A50323)
2012 MACK CHU613 DAY CAB FLAT TOP ROAD TRACTOR (A51243)
2012 MACK CHU613...
John Deere 893 Corn Head (A50514)
John Deere 893...
2016 Chevrolet Caprice Sedan (A50324)
2016 Chevrolet...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
 
Top