Im having a 28x36 metal garage put up on concrete slab. Lumber prices dictated going metal .They are saying 12 wks min on delivery. waiting now on concrete, hope it warms back up a little.
 
   / New garage time!
  • Thread Starter
#913  
That's some serious work!!! Wonder what three stories would have been like?

Having to do it myself, I'm kind of glad it's only 2. I probably would have rented a boom truck to go any higher.
 
   / New garage time!
  • Thread Starter
#914  
Im having a 28x36 metal garage put up on concrete slab. Lumber prices dictated going metal .They are saying 12 wks min on delivery. waiting now on concrete, hope it warms back up a little.

Lumber prices are high. I'm going with metal on the outside. Lead time is only 4-6 days here. Wood I would guess will normalize in the next 2-3 months, basically by the time you get your metal. Plywood has dropped 5 bucks a sheet in the past week.
 
   / New garage time! #916  
Put some Gothic Windows on the second floor and make it look like a castle!

 
   / New garage time! #917  
Lumber prices are high. I'm going with metal on the outside. Lead time is only 4-6 days here. Wood I would guess will normalize in the next 2-3 months, basically by the time you get your metal. Plywood has dropped 5 bucks a sheet in the past week.

AB Martin in Ephrata had good numbers on the metal roofing when I bought mine for a shed roof. Same panels are good for walls or roof and are made to whatever length you want. Cost is per LF. No waste. Check out the ABM panels:

ABM Panel | Metal Roofing Panel from A.B. Martin Roofing Supply
 
   / New garage time! #918  
AB Martin in Ephrata had good numbers on the metal roofing when I bought mine for a shed roof. Same panels are good for walls or roof and are made to whatever length you want. Cost is per LF. No waste. Check out the ABM panels:

ABM Panel | Metal Roofing Panel from A.B. Martin Roofing Supply

Great company to deal with. When I needed white metal panels for the ceiling of my Morton building I used this company. They cut the panels to specific lengths that I had requested and had everything ready for pickup when I arrived to get them.
 
   / New garage time! #919  
Im having a 28x36 metal garage put up on concrete slab. Lumber prices dictated going metal .They are saying 12 wks min on delivery. waiting now on concrete, hope it warms back up a little.

Here's hoping you have good weather to get your building assembled. They don't take long if you have 2 or 3 guys that kinda know what they are doing.
 
   / New garage time! #920  
2x4s had come down to 6 bucks ,But now there back up to 8 . Couldnt afford to build a house now. Last yr my son built a house and his lumber bill was over 150,ooo. Cant imagine what it would be today.
 

Tractor & Equipment Auctions

502 (A52708)
502 (A52708)
NEW Wolverine Skid Steer Pallet  Fork Hydraulic Adjustable (A59000)
NEW Wolverine Skid...
(2) SHOP VACS ON PALLET (A58374)
(2) SHOP VACS ON...
2021 Ver-Mac PCMS-3812 Solar S/A Towable Trailer Message Board (A55973)
2021 Ver-Mac...
2007 Sterling L9500 National Crane 1800 40 Ton Tri Axle Telescopic Boom Crane Truck (A55973)
2007 Sterling...
John Deere 5103 (A53317)
John Deere 5103...
 
Top