grsthegreat
Super Star Member
get a meter on the 2 generator fed wires on transfer switch while gen is running to verify 240. then check each one against neutral and grouns for 120V.
then shed load and see what happens.
im off to service 2 generators now
then shed load and see what happens.
im off to service 2 generators now