paulsharvey
Elite Member
So, not to get too far down the rabbit hole on contractors but;
about 15 years ago, I'm a superintendent for a small (I do mean Small) commercial construction company, and PM asks me to go look at a covered storage we were going to bid in Alachua FL.
We walk it, pretty simple, some engineered footers, dry site, and turn the metal building erection sub loose; Until, getting ready to leave, I notice a 48" live oak stump that had about 1-2" of gravel over the top, in the building foot print. I point it out to the PM, cause that's gonna take several thousand to dig out, backfill in lifts, and haul off. He says, if we include that, we lose the bid. I tell him, well, maybe, or we lose that money after the bid, or we fight with client over a change order. We didn't get the job.
about 15 years ago, I'm a superintendent for a small (I do mean Small) commercial construction company, and PM asks me to go look at a covered storage we were going to bid in Alachua FL.
We walk it, pretty simple, some engineered footers, dry site, and turn the metal building erection sub loose; Until, getting ready to leave, I notice a 48" live oak stump that had about 1-2" of gravel over the top, in the building foot print. I point it out to the PM, cause that's gonna take several thousand to dig out, backfill in lifts, and haul off. He says, if we include that, we lose the bid. I tell him, well, maybe, or we lose that money after the bid, or we fight with client over a change order. We didn't get the job.