Another Bridge Project

   / Another Bridge Project #21  
Meadowlark,

Great project and congratulations on finishing it so quickly. You must have worked on it every day!!!!

I'm sure the ability to get across it year round was more then worth the $200 you spent on it. hahaha

Eddie
 
   / Another Bridge Project
  • Thread Starter
#22  
Eddie,

Thanks and yes I did work on it every day until completion. The location is very vulnerable to wet conditions and hence my window for getting it done was considered to be very short by me.

Remember, the lumber was all "free"....recycled county bridge lumber. All I had to do was move it to my location, which took two days just in itself. If I hadn't recycled it, it would have just gone to waste.

I really enjoyed the project, in spite of 100 deg. temps most days. It was a real challenge to utilize my equipment efficiently to make up for no other labor help. Time will tell if it holds up or not.
 

Tractor & Equipment Auctions

UNUSED CFG H15R EXCAVATOR (A51247)
UNUSED CFG H15R...
2019 Ford F550 Bucket Truck - Powerstroke Diesel - Auto Trans - 4X4 - 72258 miles -Altec AT40G Boom (A53472)
2019 Ford F550...
(1) 12ft Tarter Gate (A51573)
(1) 12ft Tarter...
UNUSED CFG INDUSTRIAL 12EX-ATA MINI EXC ATTACHMENT (A51248)
UNUSED CFG...
2004 FORD F-650 SUPER DUTY DUMP TRUCK (A51406)
2004 FORD F-650...
2009 Skeeter SL190 19ft Boat with 21ft Boat Trailer (A51694)
2009 Skeeter SL190...
 
Top