Meadowlark,

Great project and congratulations on finishing it so quickly. You must have worked on it every day!!!!

I'm sure the ability to get across it year round was more then worth the $200 you spent on it. hahaha

Eddie
 
   / Another Bridge Project
  • Thread Starter
#22  
Eddie,

Thanks and yes I did work on it every day until completion. The location is very vulnerable to wet conditions and hence my window for getting it done was considered to be very short by me.

Remember, the lumber was all "free"....recycled county bridge lumber. All I had to do was move it to my location, which took two days just in itself. If I hadn't recycled it, it would have just gone to waste.

I really enjoyed the project, in spite of 100 deg. temps most days. It was a real challenge to utilize my equipment efficiently to make up for no other labor help. Time will tell if it holds up or not.
 

Tractor & Equipment Auctions

Steel Work Bench 24" x 60" w/6" Irwin Vise (NO CONTENTS) (A59076)
Steel Work Bench...
BOSS 990 Fuel Trailer - 990 Gallon Farm Diesel Tank, Field Refueling Solution (A56435)
BOSS 990 Fuel...
2020 Topcat 48" Hydraulic Articulating Skid Steer Cutter, S/N BORC20120101, Asset# 69 (A59076)
2020 Topcat 48"...
2008 JOHN DEERE 310SJ BACKHOE (A52709)
2008 JOHN DEERE...
2013 Ford F-550 4x4 Auto Crane 4004EH 4,000lb. 2 Ton Crane Mechanics Truck (A55973)
2013 Ford F-550...
2013 Ford F-450 Flatbed Service Truck (A55973)
2013 Ford F-450...
 
Top