Another Bridge Project

   / Another Bridge Project #21  
Meadowlark,

Great project and congratulations on finishing it so quickly. You must have worked on it every day!!!!

I'm sure the ability to get across it year round was more then worth the $200 you spent on it. hahaha

Eddie
 
   / Another Bridge Project
  • Thread Starter
#22  
Eddie,

Thanks and yes I did work on it every day until completion. The location is very vulnerable to wet conditions and hence my window for getting it done was considered to be very short by me.

Remember, the lumber was all "free"....recycled county bridge lumber. All I had to do was move it to my location, which took two days just in itself. If I hadn't recycled it, it would have just gone to waste.

I really enjoyed the project, in spite of 100 deg. temps most days. It was a real challenge to utilize my equipment efficiently to make up for no other labor help. Time will tell if it holds up or not.
 

Tractor & Equipment Auctions

Swict 78in Bucket Skid Steer Attachment (A44571)
Swict 78in Bucket...
2014 UTILITY 53X102 DRY VAN TRAILER (A43004)
2014 UTILITY...
INOP/NON RUNNING 2016 International CT660 Truck, VIN # 3HTJGTKT6GN292959 (A44391)
INOP/NON RUNNING...
2007 MACK CHN613 DAY CAB (A43004)
2007 MACK CHN613...
2020 MACK PINNACLE (INOPERABLE) (A45046)
2020 MACK PINNACLE...
2016 Chevrolet Malibu Sedan (A44572)
2016 Chevrolet...
 
Top