Another Bridge Project

/ Another Bridge Project #21  
Meadowlark,

Great project and congratulations on finishing it so quickly. You must have worked on it every day!!!!

I'm sure the ability to get across it year round was more then worth the $200 you spent on it. hahaha

Eddie
 
/ Another Bridge Project
  • Thread Starter
#22  
Eddie,

Thanks and yes I did work on it every day until completion. The location is very vulnerable to wet conditions and hence my window for getting it done was considered to be very short by me.

Remember, the lumber was all "free"....recycled county bridge lumber. All I had to do was move it to my location, which took two days just in itself. If I hadn't recycled it, it would have just gone to waste.

I really enjoyed the project, in spite of 100 deg. temps most days. It was a real challenge to utilize my equipment efficiently to make up for no other labor help. Time will tell if it holds up or not.
 

Marketplace Items

SANY SY225C9C5KL EXCAVATOR (A59823)
SANY SY225C9C5KL...
ALLMETAL MOBILE PRESSURE WASHER (A58214)
ALLMETAL MOBILE...
2023 Takeuchi TL6R Compact Track Loader Skid Steer w Low Hours (A61307)
2023 Takeuchi TL6R...
2015 John Deere CX15 (A60462)
2015 John Deere...
2020 DITCH WITCH HX30 TRAILER VACUUM TRAILER (A59823)
2020 DITCH WITCH...
2006 TRAIL KING ADVANTAGE PLUS RGN/DETACH TRAILER (A60430)
2006 TRAIL KING...
 
Top