Another Bridge Project

/ Another Bridge Project #21  
Meadowlark,

Great project and congratulations on finishing it so quickly. You must have worked on it every day!!!!

I'm sure the ability to get across it year round was more then worth the $200 you spent on it. hahaha

Eddie
 
/ Another Bridge Project
  • Thread Starter
#22  
Eddie,

Thanks and yes I did work on it every day until completion. The location is very vulnerable to wet conditions and hence my window for getting it done was considered to be very short by me.

Remember, the lumber was all "free"....recycled county bridge lumber. All I had to do was move it to my location, which took two days just in itself. If I hadn't recycled it, it would have just gone to waste.

I really enjoyed the project, in spite of 100 deg. temps most days. It was a real challenge to utilize my equipment efficiently to make up for no other labor help. Time will tell if it holds up or not.
 

Marketplace Items

2019 CAT TL1055D (A58214)
2019 CAT TL1055D...
2012 Ford F-550 4x4 Chipper Truck (A55973)
2012 Ford F-550...
2024 MACK GRANITE GR46F DUMP TRUCK (A59823)
2024 MACK GRANITE...
2012 CATERPILLAR 308D CR EXCAVATOR (A59823)
2012 CATERPILLAR...
2000 PETERBILT 379 MID-ROOF SLEEPER (A58214)
2000 PETERBILT 379...
2019 CATERPILLAR 420F2 IT BACKHOE (A59823)
2019 CATERPILLAR...
 
Top