Another Bridge Project

/ Another Bridge Project #21  
Meadowlark,

Great project and congratulations on finishing it so quickly. You must have worked on it every day!!!!

I'm sure the ability to get across it year round was more then worth the $200 you spent on it. hahaha

Eddie
 
/ Another Bridge Project
  • Thread Starter
#22  
Eddie,

Thanks and yes I did work on it every day until completion. The location is very vulnerable to wet conditions and hence my window for getting it done was considered to be very short by me.

Remember, the lumber was all "free"....recycled county bridge lumber. All I had to do was move it to my location, which took two days just in itself. If I hadn't recycled it, it would have just gone to waste.

I really enjoyed the project, in spite of 100 deg. temps most days. It was a real challenge to utilize my equipment efficiently to make up for no other labor help. Time will tell if it holds up or not.
 

Marketplace Items

(2) DOUBLE AXLE FENDERS (A64280)
(2) DOUBLE AXLE...
1986 Eager Beaver B9D0W 20ft. 11 Ton Tri Axle Dovetail Tag A Long Tailer (A61568)
1986 Eager Beaver...
2016 RAM 5500 Bucket Truck - Cummins Diesel - Auto Trans - 4X4 - Terex LT40 Boom (A61306)
2016 RAM 5500...
2018 Bell B30E 30 Ton Articulated Dump Truck (A64194)
2018 Bell B30E 30...
JOHN DEERE 7330 PREMIUM TRACTOR (A64280)
JOHN DEERE 7330...
2023 Ford F-350 4x4 Flatbed Truck, VIN # 1FTRF3DM5PEC15665 (A65563)
2023 Ford F-350...
 
Top