Another Bridge Project

/ Another Bridge Project #21  
Meadowlark,

Great project and congratulations on finishing it so quickly. You must have worked on it every day!!!!

I'm sure the ability to get across it year round was more then worth the $200 you spent on it. hahaha

Eddie
 
/ Another Bridge Project
  • Thread Starter
#22  
Eddie,

Thanks and yes I did work on it every day until completion. The location is very vulnerable to wet conditions and hence my window for getting it done was considered to be very short by me.

Remember, the lumber was all "free"....recycled county bridge lumber. All I had to do was move it to my location, which took two days just in itself. If I hadn't recycled it, it would have just gone to waste.

I really enjoyed the project, in spite of 100 deg. temps most days. It was a real challenge to utilize my equipment efficiently to make up for no other labor help. Time will tell if it holds up or not.
 

Marketplace Items

2013 Freightliner M2 106 Altec TA45M 44ft. Insulated Bucket Truck (A60352)
2013 Freightliner...
2012 TROXELL 140BBL TRI AXLE VACUUM TRAILER (A60736)
2012 TROXELL...
(15) Polyethylene Road Bed Protection Pads (A60463)
(15) Polyethylene...
207283 (A52708)
207283 (A52708)
2003 POLAR TANK (A60736)
2003 POLAR TANK...
2002 Kenworth T300 TMA Truck (A55973)
2002 Kenworth T300...
 
Top