Another Bridge Project

   / Another Bridge Project #21  
Meadowlark,

Great project and congratulations on finishing it so quickly. You must have worked on it every day!!!!

I'm sure the ability to get across it year round was more then worth the $200 you spent on it. hahaha

Eddie
 
   / Another Bridge Project
  • Thread Starter
#22  
Eddie,

Thanks and yes I did work on it every day until completion. The location is very vulnerable to wet conditions and hence my window for getting it done was considered to be very short by me.

Remember, the lumber was all "free"....recycled county bridge lumber. All I had to do was move it to my location, which took two days just in itself. If I hadn't recycled it, it would have just gone to waste.

I really enjoyed the project, in spite of 100 deg. temps most days. It was a real challenge to utilize my equipment efficiently to make up for no other labor help. Time will tell if it holds up or not.
 

Tractor & Equipment Auctions

2008 Ford Crown Victoria Sedan (A44572)
2008 Ford Crown...
12ft Utility Trailer with Pressure Washer and Tank (A44391)
12ft Utility...
2015 Ford Transit 350HD Cargo Van (A44571)
2015 Ford Transit...
2013 Chevrolet 3500 4x4 Flatbed Truck, VIN # 1GB4K0C86DF193386 (A44391)
2013 Chevrolet...
1987 Mack RW613 Truck, VIN # 1M2AY04Y3HM003150 (A44391)
1987 Mack RW613...
2023 LOAD TRAIL FLATBED TRAILER (A43004)
2023 LOAD TRAIL...
 
Top