AZ ranch

   / AZ ranch
  • Thread Starter
#1,381  
IMG_1345.jpeg


I went ahead and put perforated drain pipe behind the block I have done so far.
I know, some think I’m nuts for doing the drain pipe when I haven’t even finished the first course yet, but I’ve had multiple cave-ins and I’m just trying to make sure I can get some wall up asap by the most susceptible area to cave.
I even have the apron area to pour yet. That’s the section with all the pieces of rebar.
 
   / AZ ranch #1,383  
I just now found my tool for smoothing the seam between blocks. I may not use it until the 5th course as everything below that will be covered in dirt, inside and out.
A small kitchen spoon works good as well.
You know you’ll misplace it again before course 5!!
 
   / AZ ranch
  • Thread Starter
#1,390  
About 12 block a day is what my back will tolerate. Then there’s tarring the outside and hauling/washing gravel for backfill, grinding and placing rebar, etc. The actual laying of block is about 25% of the job, so I’m happy with the progress rate.
 

Tractor & Equipment Auctions

2006 KENWORTH (INOPERABLE)T800 (A55745)
2006 KENWORTH...
2004 John Deere 310G 4x4 Loader Backhoe (A55787)
2004 John Deere...
2018 Ford F-450 Ext. Cab 4x4 Mason Dump Truck (A53422)
2018 Ford F-450...
2012 PETERBILT 365 (A55745)
2012 PETERBILT 365...
IMPORTANT PLEASE READ!!!! TERMS AND CONDITIONS (A54865)
IMPORTANT PLEASE...
2020 INTERNATIONAL MV607 24FT NON CDL BOX TRUCK (A56129)
2020 INTERNATIONAL...
 
Top