buggyman1
Platinum Member
Here goes...Bridge#2: I bought a new mixer for the concrete, saves a ton of time, and I borrowed a friends generator to run it. This is the concrete for the footer, for the wall I plan to build to support the middle of the bridge. I used all of it and then some (59 bags). A truck couldn't get to the site is why I mixed it myself.