Bridge for ATV

   / Bridge for ATV
  • Thread Starter
#101  
It was trimmed up and hauled to the bridge.
 

Attachments

  • 517985-railclubcar.jpg
    517985-railclubcar.jpg
    66.8 KB · Views: 506
   / Bridge for ATV
  • Thread Starter
#102  
The tree was sanded and mounted on post on the side of the rock stairs.
 

Attachments

  • 517986-woodrail.jpg
    517986-woodrail.jpg
    54.2 KB · Views: 1,030
   / Bridge for ATV
  • Thread Starter
#103  
The wagon wheel rail was picked up with the backhoe and lowered to the bridge. There is a tree which we call the goat head tree, and it was keeping the rail from being level.
 

Attachments

  • 517987-tractorlowerrail.jpg
    517987-tractorlowerrail.jpg
    61 KB · Views: 478
   / Bridge for ATV
  • Thread Starter
#104  
After failed attempts to move the culvert, the rail was mounted anyways and because the knob of the tree landed right in the middle of the rail end loop the level was only off by 3/4".
 

Attachments

  • 517988-treeknob.jpg
    517988-treeknob.jpg
    55.6 KB · Views: 513
   / Bridge for ATV
  • Thread Starter
#105  
The rail was bolted to the base.
 

Attachments

  • 517989-bolton.jpg
    517989-bolton.jpg
    81.6 KB · Views: 474
   / Bridge for ATV
  • Thread Starter
#106  
The other rail will have to wait till next week. This is the view from upstream. /forums/images/graemlins/smile.gif
 

Attachments

  • 517990-upstreamrail2.jpg
    517990-upstreamrail2.jpg
    59.8 KB · Views: 471
   / Bridge for ATV
  • Thread Starter
#107  
New week. The second rail is moved to be set in place with the BH.

(note- these are different photos from the ones in the meetings and get together section. The snake pictures are omitted here.) /forums/images/graemlins/smirk.gif
 

Attachments

  • 522022-3rail1one.jpg
    522022-3rail1one.jpg
    95.9 KB · Views: 373
   / Bridge for ATV
  • Thread Starter
#108  
The rail is set in place.
 

Attachments

  • 522025-3rail2.jpg
    522025-3rail2.jpg
    80.6 KB · Views: 375
   / Bridge for ATV
  • Thread Starter
#109  
The level is checked, again, and the lower left side needs to be raised as this photo shows.
 

Attachments

  • 522029-3rail3.jpg
    522029-3rail3.jpg
    62.9 KB · Views: 400
   / Bridge for ATV
  • Thread Starter
#110  
The BH is utilized again and the bridge is leveled.
The rock ends on three edges up to the base of the bridge need to be rebuilt - moved a foot out and up to the bridge base and wings. These rock footings were put in place before the metal bridge idea was formulated. The corner rocks are in the process of being dug out and re-stacked.
 

Attachments

  • 522034-3rail4.jpg
    522034-3rail4.jpg
    68.9 KB · Views: 425

Tractor & Equipment Auctions

2016 Ford F-550 Service Truck (A53422)
2016 Ford F-550...
2013 VOLVO VNL64T TANDEM AXLE MID ROOF SLEEPER (A54313)
2013 VOLVO VNL64T...
2025 12V Diesel Pump and Hose (A50324)
2025 12V Diesel...
2003 Pierce Spartan Pumper Fire Truck (A51692)
2003 Pierce...
2022 Big Tex 22GN-35BK+5MR 40ft T/A Gooseneck Equipment Trailer (A51691)
2022 Big Tex...
2017 Ford Fusion Hybrid Sedan (A53424)
2017 Ford Fusion...
 
Top