BX22/23/24 Owners...Show your project pictures!

   / BX22/23/24 Owners...Show your project pictures! #41  
Yes. Just finished up today. I have put in lots of pipe around the place as I stated before. The BX can handle any trenching you may want to do .
I have lots of natural springs on my property and the driveway always iced up in the winter and got real soggy with the rains.
I dug down about the depth of the backhoe bucket on end and keep the as my guage to tell me if I 'm digging my trench level. I used corregated 4"' drain pipe along the drive and schedule 40 pipe anywhere I crossed the drive.
I used landscape fabric to wrap the pipe to keep it from silting up. I found it cheaper to buy a 3'by 50' roll of landscape fabric than the white wrap they sell for the pipe. I use electrical tape to wrap the fabric on the pipe. I cut the whole roll in half using a sharp pocket knife or razor. The first time I think we tried to cut as we went and boy was that a headache. /forums/images/graemlins/grin.gif
I can get 3B gravel pretty cheap from a local quarry ($9 a ton delivered) so I use it fill the ditches to the top. One level FEL bucket fills the ditch to the top if you dig like I said above with the BH.
 
   / BX22/23/24 Owners...Show your project pictures! #42  
Yes. Just finished up today. I have put in lots of pipe around the place as I stated before. The BX can handle any trenching you may want to do .
I have lots of natural springs on my property and the driveway always iced up in the winter and got real soggy with the rains.
I dug down about the depth of the backhoe bucket on end and keep the as my guage to tell me if I 'm digging my trench level. I used corregated 4"' drain pipe along the drive and schedule 40 pipe anywhere I crossed the drive.
I used landscape fabric to wrap the pipe to keep it from silting up. I found it cheaper to buy a 3'by 50' roll of landscape fabric than the white wrap they sell for the pipe. I use electrical tape to wrap the fabric on the pipe. I cut the whole roll in half using a sharp pocket knife or razor. The first time I think we tried to cut as we went and boy was that a headache. /forums/images/graemlins/grin.gif
I can get 3B gravel pretty cheap from a local quarry ($9 a ton delivered) so I use it fill the ditches to the top. One level FEL bucket fills the ditch to the top if you dig like I said above with the BH.
 
   / BX22/23/24 Owners...Show your project pictures! #43  
This is my back 'yard' that will require at least 100 tons of fill to get a table flat (slight grade for drainage) playing area for my kids. Figuring 40 tons 3/4 stone, 20 tons clean fill, 30 tons of topsoil and don't forget the compost. Planning on using york rake/harrow or chain link/roller to work the material, plant seed in the fall. Kind of boring picture now but I'm quite excited about the whole project-it is just fun stuff.

Dale
 

Attachments

  • 898054-DSC_0049.jpg
    898054-DSC_0049.jpg
    92.3 KB · Views: 319
   / BX22/23/24 Owners...Show your project pictures! #44  
This is my back 'yard' that will require at least 100 tons of fill to get a table flat (slight grade for drainage) playing area for my kids. Figuring 40 tons 3/4 stone, 20 tons clean fill, 30 tons of topsoil and don't forget the compost. Planning on using york rake/harrow or chain link/roller to work the material, plant seed in the fall. Kind of boring picture now but I'm quite excited about the whole project-it is just fun stuff.

Dale
 
   / BX22/23/24 Owners...Show your project pictures!
  • Thread Starter
#45  
Ok...Ok...you guys have pushed me over the edge...put the last nail in the coffin. I gave the dealer the go ahead to prepare a BX24 for delivery this Saturday. Thanks for helping spend my money BX24, MD taxes...5%, industrial R4 filled tires, delivered...Total:$15,532 . I think it is a fair deal. Keep this post going for future buyers...it has been very helpful.

-Walt
 
   / BX22/23/24 Owners...Show your project pictures!
  • Thread Starter
#46  
Ok...Ok...you guys have pushed me over the edge...put the last nail in the coffin. I gave the dealer the go ahead to prepare a BX24 for delivery this Saturday. Thanks for helping spend my money BX24, MD taxes...5%, industrial R4 filled tires, delivered...Total:$15,532 . I think it is a fair deal. Keep this post going for future buyers...it has been very helpful.

-Walt
 
   / BX22/23/24 Owners...Show your project pictures! #47  
Congrats on the new toy! post some pix of YOUR first project!
Have fun.
 
   / BX22/23/24 Owners...Show your project pictures! #48  
Congrats on the new toy! post some pix of YOUR first project!
Have fun.
 
   / BX22/23/24 Owners...Show your project pictures! #49  
First project with the BX23 was a down spout drain pipe. Small project that didn't take long at all.
 

Attachments

  • 899118-DSCN0677 (Small).JPG
    899118-DSCN0677 (Small).JPG
    75.1 KB · Views: 275
   / BX22/23/24 Owners...Show your project pictures! #50  
First project with the BX23 was a down spout drain pipe. Small project that didn't take long at all.
 

Tractor & Equipment Auctions

24in Tractor Backhoe Bucket BT4555 (A53472)
24in Tractor...
2015 FREIGHTLINER SPRINTER VAN (A52576)
2015 FREIGHTLINER...
2014 INTERNATIONAL PROSTAR SLEEPER (A52576)
2014 INTERNATIONAL...
IMPORTANT PLEASE READ!!!! TERMS AND CONDITIONS (A51573)
IMPORTANT PLEASE...
IMPORTANT PLEASE READ!!!! TERMS AND CONDITIONS (A51572)
IMPORTANT PLEASE...
(1) HD 24ft Free Standing Corral Panel (A51572)
(1) HD 24ft Free...
 
Top