Today I go live on the building of a circular paver driveway in the front yard. The last 18 months I have made the curbings and brought in the gravel.
The pavers are acme brick pavers and are heavier and thicker than the pavers at the box stores.
I have done 2 practice porches using a basket weave design and I think I'm ready to start laying On hand I have 10,000 pavers.
I think I will just lay the pavers straight staggered on the drive, I'll see what it looks like after the fist few feet.
I have put in cross curbing to divide the drive into 1500 paver sections.
To tie the pavers together I will be using polymer sand.
I will try to lay 1000 pavers a week and hopefully be done in 10 weeks. This makes my wife laugh considering I'm already 18 months into this project.
The pavers are acme brick pavers and are heavier and thicker than the pavers at the box stores.
I have done 2 practice porches using a basket weave design and I think I'm ready to start laying On hand I have 10,000 pavers.
I think I will just lay the pavers straight staggered on the drive, I'll see what it looks like after the fist few feet.
I have put in cross curbing to divide the drive into 1500 paver sections.
To tie the pavers together I will be using polymer sand.
I will try to lay 1000 pavers a week and hopefully be done in 10 weeks. This makes my wife laugh considering I'm already 18 months into this project.