terry.dinerman
Gold Member
- Joined
- Oct 11, 2009
- Messages
- 405
- Tractor
- 1990 - JD 870
Just had a bid from "Entergy" here in Grimes County, Texas for 1,000 feet of primary service run along an existing dirt road from an existing feeder on the State Highway to my saw pole:
Overhead - $6.80 / ft
Buried - $7.20 /ft
This includes such variables as crossing a State Highway to reach my property, minimal ROW clearance as I have already cleared most of the trees from the ROW myself....
Be Safe
T
Overhead - $6.80 / ft
Buried - $7.20 /ft
This includes such variables as crossing a State Highway to reach my property, minimal ROW clearance as I have already cleared most of the trees from the ROW myself....
Be Safe
T