Engine change out

   / Engine change out
  • Thread Starter
#11  
Thanks for checking that out for me,that seems about right.....Mike
 
   / Engine change out #12  
We have not had to change out a Triton engine as of yet. I doubt seriously if many people could switch this motor out in 19.5 hours. You will probably spend at least 8 hours changing parts over once the engine is out. I believe a rebuilt engine with heads is over $3000 (not list). I hope you have a good back as you will be laying over the front for a while. The last 4 cylinders are under the cowl of the cab. Any time you work on a 4WD, that takes longer. $1000/40 hours=$25 hour..
 
   / Engine change out #13  
I know I wouldn't have been able to do it in that time. I would have spent the first four hours cussin' and kicking stuff around the shop just because I got stuck doin' it. /forums/images/graemlins/grin.gif
 

Tractor & Equipment Auctions

2024 JOHN DEERE 331P-TIER SKID STEER (A51246)
2024 JOHN DEERE...
(2) METAL SPOOLS W/ SOME DURALINE 4" PVC PIPE (A51248)
(2) METAL SPOOLS...
2021 M&J PRESHRED 4000M SHREDDER (A53426)
2021 M&J PRESHRED...
UNUSED FUTURE 40" HYD TILTING BUCKET (A51248)
UNUSED FUTURE 40"...
2016 JLG 2032ES Electric Scissor Lift, 369hrs (A52384)
2016 JLG 2032ES...
UNUSED JCT 72" HYD TILLER (A51248)
UNUSED JCT 72" HYD...
 
Top