Engine change out

   / Engine change out
  • Thread Starter
#11  
Thanks for checking that out for me,that seems about right.....Mike
 
   / Engine change out #12  
We have not had to change out a Triton engine as of yet. I doubt seriously if many people could switch this motor out in 19.5 hours. You will probably spend at least 8 hours changing parts over once the engine is out. I believe a rebuilt engine with heads is over $3000 (not list). I hope you have a good back as you will be laying over the front for a while. The last 4 cylinders are under the cowl of the cab. Any time you work on a 4WD, that takes longer. $1000/40 hours=$25 hour..
 
   / Engine change out #13  
I know I wouldn't have been able to do it in that time. I would have spent the first four hours cussin' and kicking stuff around the shop just because I got stuck doin' it. /forums/images/graemlins/grin.gif
 

Tractor & Equipment Auctions

80in HD Tooth Bucket with Side Cutters ONE PER LOT (A52128)
80in HD Tooth...
Gooseneck Livestock Stock Trailer - Tandem Axle Ranch Hauler - Selling Absolute, No Reserve (A52128)
Gooseneck...
2011 CATERPILLAR M318D MOBILE EXCAVATOR (A51242)
2011 CATERPILLAR...
2025 12V Diesel Pump and Hose (A50324)
2025 12V Diesel...
2006 INTERNATIONAL 4300 DT466 SBA 4X2 BUCKET TRUCK (A51406)
2006 INTERNATIONAL...
2012 UTILITY VS2DX 53FT DRY VAN TRAILER (A52141)
2012 UTILITY VS2DX...
 
Top