Engine change out

   / Engine change out
  • Thread Starter
#11  
Thanks for checking that out for me,that seems about right.....Mike
 
   / Engine change out #12  
We have not had to change out a Triton engine as of yet. I doubt seriously if many people could switch this motor out in 19.5 hours. You will probably spend at least 8 hours changing parts over once the engine is out. I believe a rebuilt engine with heads is over $3000 (not list). I hope you have a good back as you will be laying over the front for a while. The last 4 cylinders are under the cowl of the cab. Any time you work on a 4WD, that takes longer. $1000/40 hours=$25 hour..
 
   / Engine change out #13  
I know I wouldn't have been able to do it in that time. I would have spent the first four hours cussin' and kicking stuff around the shop just because I got stuck doin' it. /forums/images/graemlins/grin.gif
 

Tractor & Equipment Auctions

2018 NISSAN TITAN PICKUP TRUCK (A51222)
2018 NISSAN TITAN...
Agro Trend 7' 3PT Snow Blower (A52349)
Agro Trend 7' 3PT...
2009 CATERPILLAR 420E BACKHOE (A51406)
2009 CATERPILLAR...
2012 VANGUARD 53FT DRY VAN TRAILER (A52141)
2012 VANGUARD 53FT...
2020 CATERPILLAR 289D3 SKID STEER (A51242)
2020 CATERPILLAR...
Homemade Head Cart (A50514)
Homemade Head Cart...
 
Top