OP
STx
Veteran Member
- Joined
- Oct 13, 2014
- Messages
- 1,132
- Location
- Bandera, Tx
- Tractor
- New Holland TC40 DA, Deere 17D, Hyster SX50 forklift, Case D450, Kubota ZD1011-54, International Dump Truck, Kubota SVL-952S, Volovo EC250DL
Got most of the first row of sheathing and the ridge board set today. I got my master rafter worked out so tomorrow I just need to trace and cut the rest. If all goes well, I hope to.get it decked tomorrow.
We picked up 6 sets of scaffolding yesterday so we'll be able to safely do the rest of the sheathing and install.the siding. It's starting to actually look like a building now.
The sheathing did take all.the sway put of it, it was probably for the best that I broke down and did it. The sway had brought the building slightly out of square but a little push with the tractor up high fixed it right up and the sheathing locked it in.


We picked up 6 sets of scaffolding yesterday so we'll be able to safely do the rest of the sheathing and install.the siding. It's starting to actually look like a building now.
The sheathing did take all.the sway put of it, it was probably for the best that I broke down and did it. The sway had brought the building slightly out of square but a little push with the tractor up high fixed it right up and the sheathing locked it in.


