Re: House, Chimney Construction

Wow, looks great MDNY! Be sure to get some pics of that pumper truck, should be impressive. How far off the street are you?

We had a meeting with our builder last night. Went over costs to date and such. We're running a bit over, but not as bad as we were expecting. Siding has been an issue for us. The color we want is only available in the top of the line vinyl siding. That's OK in the long run, but more expensive up front. Also, getting high/no quotes from the siders due to the height. She finally found a guy to do the job and he was reasonable. We'll still have to foot the bill for a man-lift to reach the peaks.

Our final move from our current house into the rental is this weekend and next. Busy, busy, busy /w3tcompact/icons/smile.gif
 
   / House #212  
Re: House, Chimney Construction

Rob,

We are about 250FT back from the road, but the driveway is bout 300FT +/- long. We did pretty much all of the deciding to have a budget in place before we even broke ground. The only things that are allowances were the fireplace (we chose it and it is within budget) the well and tank, and finally the lighting budget. We have to pick siding and shingles.

Funny thing about shingles. Our builder has been using the 25YR Certainteed. He has a house going up about 1.5 months ahead of ours. He just got them in for that job and found that the shingle companys seemed to all at the same time (uh huh) made a change. They made the 25YR a 30YR and and introduced a new 25YR. No big deal until you notice that the new 25YR is not the same as the old. So we are going 30YR paying a few hundred more and not having to worry.

So far we are about $1.5k over. The excavators did plan for extra stone needed on the left side and front bay from unexpected water and soft soil. I agree a dry basement is a higher priority. Also the pump truck wasn't in the budget but due to weather it is now. Not sure who is paying that me or the builder. Then there is the shingle increase. Not too bad so far.

Anyway here are som pics. the first is pump truck
 

Attachments

  • 33-160473-Dsc00168.jpg
    33-160473-Dsc00168.jpg
    116.8 KB · Views: 112
   / House #213  
Re: House, Chimney Construction

Here is the back of the pump truck unfolding (so to speak)

Michael
 

Attachments

  • 33-160474-Dsc00165.jpg
    33-160474-Dsc00165.jpg
    95.1 KB · Views: 126
   / House #214  
Re: House, Chimney Construction

Here is the pump truck fully extended.
 

Attachments

  • 33-160475-Dsc00169.jpg
    33-160475-Dsc00169.jpg
    66.9 KB · Views: 108
   / House #215  
Re: House, Chimney Construction

My first load of concrete for the walls
 

Attachments

  • 33-160477-Dsc00173.jpg
    33-160477-Dsc00173.jpg
    81.9 KB · Views: 127
   / House #216  
Re: House, Chimney Construction

Let us not forget the exceptional weather people and mother nature. They had originally called for a nice day. But of course the weather changed a day later.

This is the pump truck operator hard at work.
 

Attachments

  • 33-160478-Dsc00174.jpg
    33-160478-Dsc00174.jpg
    97.7 KB · Views: 105
   / House #217  
Re: House, Chimney Construction

The last load. It took about 54 yards of concreted to fill my walls up. We have 8' basement with 4' garage walls each is 10" thick.

I got there about 8:30 am and stayed until 4pm. The trucks started pumping at 10:00 and finished at 3:45. We originally had until 2pm with the boom operator, but he was a great guy and was willing to stay and let the final bit in. they had to bring in a last few yards to meet the fill.

They are pulling forms tomorrow and I will take pics on Sunday. Oh yeah got my nice knee high yellow boots to keep my feet dry and mud free. They are nice, but do get heavy.

Michael
 

Attachments

  • 33-160482-Dsc00191.jpg
    33-160482-Dsc00191.jpg
    141.7 KB · Views: 120
   / House
  • Thread Starter
#218  
Re: House, Chimney Construction

Absolutely awesome Michael! Of course, I'm an equipment junkie. I actually have a 1:50 scale model of a pumper. Same Mack chassis (not sure why that chassis is so popular with pumpers, but it is) but my model has a Schwing pumper, not a Putz. Good you got some photos to remember that by! Your pouring weather looks as bad as ours though ours turned to snow partway through. Hope it improves for the rest of your project /w3tcompact/icons/smile.gif
 
   / House #219  
Re: House, Chimney Construction

Ohhhhhhh!!!!!! you guys are KILLING me! I wan't my new house NOW!
 
   / House #220  
Re: House, Chimney Construction

s1120

Get in line. My builder projects sometime in October for our move in date. We didn't get an appraisal for the full construciton value so other funding options are covering the balance. It is hard to build a victorian home (right RobS) and get a good appraisal. Everyone wants a simple box to keep the cost down. Not us.

RobS, I know what you mean. the rain was bad, but I had on my new boots, an umbrella and rain jacket (from my golf bag) to protect me. The crew didn't even stop for lunch. But I did complement the young kid who worked last weekend to pull the footing forms on an 80 degree sunny day. He worked hard.

Nothing but rain on Mon/Tues then some sun (so they claim) then rain on Fri and Sunny for the weekend. All I know is they need to dry the mud out to move it around better.

I will tak pics of the foundation all bare and ready to be topped with a house.
 
Status
Not open for further replies.

Tractor & Equipment Auctions

2022 BARFORD TR8048 MOBILE SCREEN (A51242)
2022 BARFORD...
JOHN DEERE 3040 TRACTOR (A50459)
JOHN DEERE 3040...
2019 CATERPILLAR D6N LGP HI TRACK CRAWLER DOZER (A51242)
2019 CATERPILLAR...
Maverick 3250 Excavator Hammer (A50774)
Maverick 3250...
Set of AG R4 Wheels and Tires (A52128)
Set of AG R4...
TAKEUCHI TL12V-2 SKID STEER (A51242)
TAKEUCHI TL12V-2...
 
Top