countrybumpkin
Elite Member
- Joined
- Jun 14, 2005
- Messages
- 3,237
- Tractor
- Kioti, kubota
Nice job on all the joist hangers. I've found that it's easier for me to install the joists first, then come back and install the hangers after they are in place.
Thank you, yes I can see how it would be quite a bit faster then doing the hangers first. If I had been on a time schedule or had help holding the joists I may have done that. I couldn't use the top hangers on the beam side, so I just bought a box of the side mounts and used on both. On the beam side the joists are flush with the bottom, and on the wall side flush with the top. I have done all the work by my self on the loft including setting the beam in place, that's another reason I took the time to set the hangers in place so I could set the joists in them to hold them. I did go with the Simpson strong ties screws and hangers, really liked them.