Got a little more work done today. Not on the LPGS itself but in preparation to use it. All I need it do to complete it is cut out the hitch brackets and weld them on but I have to sort out why my plasma cutter won't work first.
I don't have T&T, nor do I have a valve with float to run it. I needed a way to let the one side link float to follow the contours better so I made a telescopic one.
3/8 x 1 1/2 flat for the clevis ends
3/4 x 1 1/2 x .065 wall for the outer
1/2 x 1 1/2 flat ground to fit as the inner
Took 1/8" off the side of the inner
First clevis made. Left it attached to the length so I had a handle at the drill press. Lower clevis end was built the same way.
Top is the left side link
Center is the new link in its fixed position
Bottom is the original adjustable link
New link extended
New link retracted
There is a total of 4" travel, 2" either way from neutral. I have room to extend travel about 3/4" on each end if I felt I needed it. Simply pull the pin to let it float, insert pin to lock in neutral. This link will also make life much easier hooking up attachments, at least until I get a quick hitch.