Whats the hose management system you are using on your grapple? I need to get one for mineI know that this will cause some negative commentary regarding quality of steel, etc. but I’m going to go ahead and put it out there- I bought a package pallet fork/ dual lid grapple from Titan. Iirc it was around $1800 w/ free shipping to Spokane.
Have found the Titan more than satisfactory in terms of strength and quality of construction (welds, pins, hydraulics, lube points) for my needs. Have moved around some pretty stout logs and such. Yes, it is heavier than many of similar size ( likely because of the use of a lower strength steel) but that hasn’t been a limiting factor to date.View attachment 690671
Whats the hose management system you are using on your grapple? I need to get one for mine
There are many styles available: hyd hose saver at DuckDuckGoWhats the hose management system you are using on your grapple? I need to get one for mine
Today is 12 weeks since I ordered mine. No email that it shipped yet. I contacted EA a week or two ago as I was originally quoted 11 weeks and Travis said it will most likely be just over 12 weeks, so hopefully next week.Just got off the fone with EA ordering a Wicked 60" grapple. 12 to 14 week lead time.
Been watching youtube on different grapples. Not gonna dog any other grapples out there. But watching all the videos from EA and the fact they are a USA company, I'll spend my money here. I've got so much work for one now, the waiting will be the stress on me.Today is 12 weeks since I ordered mine. No email that it shipped yet. I contacted EA a week or two ago as I was originally quoted 11 weeks and Travis said it will most likely be just over 12 weeks, so hopefully next week.
On last weeks "end of week walk through" posted on FB, Travis did say they finally got a bunch of the steel needed in for 2 large batches of Wicked 55's and 60's, so hopefully mine is in the second batch and being built now.
I ordered mine, a Wicked 60, about 5 weeks ago. Got the third function kit, still sitting in the box. That only took about a week to arrive.Today is 12 weeks since I ordered mine. No email that it shipped yet. I contacted EA a week or two ago as I was originally quoted 11 weeks and Travis said it will most likely be just over 12 weeks, so hopefully next week.
On last weeks "end of week walk through" posted on FB, Travis did say they finally got a bunch of the steel needed in for 2 large batches of Wicked 55's and 60's, so hopefully mine is in the second batch and being built now.
I think I received mine in 3 days, may have been longer as I tried to put it all out of my mind. I did pretty good until week 10!..Got the third function kit, still sitting in the box. That only took about a week to arrive.
I contacted Travis a few times, by both phone and email. I originally wanted the long bottom, two lid grapple. But he talked me into the Wicked 60. I think I'll be happy either way.
Yes Sir it was, I was hoping to see some order numbers, specifically mine.It was nice to see that video, and all those grapples in various stages. Looks like they are hitting it hard!