New Driveway and Polebarn

   / New Driveway and Polebarn
  • Thread Starter
#121  
.... going up ......
 

Attachments

  • 785830-IMG_1062.jpg
    785830-IMG_1062.jpg
    89 KB · Views: 466
   / New Driveway and Polebarn
  • Thread Starter
#122  
East end going into the saddle.
 

Attachments

  • 785831-IMG_1063.jpg
    785831-IMG_1063.jpg
    86.7 KB · Views: 399
   / New Driveway and Polebarn
  • Thread Starter
#123  
West end
 

Attachments

  • 785834-IMG_1064.jpg
    785834-IMG_1064.jpg
    88 KB · Views: 339
   / New Driveway and Polebarn
  • Thread Starter
#124  
South gable end done.
 

Attachments

  • 785836-IMG_1065.jpg
    785836-IMG_1065.jpg
    90 KB · Views: 352
   / New Driveway and Polebarn
  • Thread Starter
#125  
Now the north end as soon as he ties himself off.
 

Attachments

  • 785839-IMG_1066.jpg
    785839-IMG_1066.jpg
    92.5 KB · Views: 348
   / New Driveway and Polebarn
  • Thread Starter
#126  
First of the inner trusses.
 

Attachments

  • 785841-IMG_1067.jpg
    785841-IMG_1067.jpg
    81.4 KB · Views: 370
   / New Driveway and Polebarn
  • Thread Starter
#127  
All the trusses have been set so now the header for the third overhead door can be installed.
 

Attachments

  • 785845-IMG_1073.jpg
    785845-IMG_1073.jpg
    86 KB · Views: 465
   / New Driveway and Polebarn
  • Thread Starter
#128  
The outside portion.

At the end of Day 2 all the trusses had been set, the building was cabled, and some corner bracing and a sufficient amount of purlins installed to avoid problems if it got windy. No pictures as it was dark by the time we quit and I didn't make it out early enough this morning to get any pics of where they left off.
 

Attachments

  • 785846-IMG_1074.jpg
    785846-IMG_1074.jpg
    79.2 KB · Views: 439
   / New Driveway and Polebarn
  • Thread Starter
#129  
Where things stand at the end of Day 3.

I was a bit preoccupied today so no pictures of the action - just the finished product.
 

Attachments

  • 785857-IMG_1075.jpg
    785857-IMG_1075.jpg
    90.6 KB · Views: 450
   / New Driveway and Polebarn
  • Thread Starter
#130  
All the purlins installed, all corner bracing in, all jackbraces installed, and all the overhangs framed out. There's two mandoor frameouts left to do I think and then it should be ready for metal. They figure that they're running a little behind, but I'd say it's not bad for almost 3 days of work.
 

Attachments

  • 785861-IMG_1077.jpg
    785861-IMG_1077.jpg
    83.4 KB · Views: 465

Tractor & Equipment Auctions

2000 WINNEBAGO FORD F550 RV (A50854)
2000 WINNEBAGO...
WEATHER GUARD SIDE BOX (A50854)
WEATHER GUARD SIDE...
2013 John Deere 544K Articulated Wheel Loader (A50322)
2013 John Deere...
2008 DODGE RAM 3500 FLATBED TRK (INOPERABLE) (A50854)
2008 DODGE RAM...
Master MGH8500IE 8,500-Watt Generator - Electric Start, 18HP Honda Engine (A51039)
Master MGH8500IE...
2006-2009 Ford 4x4 Pickup Truck Bed (A49461)
2006-2009 Ford 4x4...
 
Top