Drains were approved as expected. The concrete guys are on board with doing the floor first. Early tomorrow is the inspection to see the visqueen is in place and the 6x6 wire mesh is down. They expect to pour on the 26th. Columns will be in place in time to eliminate the need to box around them.
Well, this switch does not change things too much.