kevin37b
Veteran Member
They should have put a set on the pipe . 2 45s on each bank and bury the pipe deep enough to stop erosion . They got lazy . No 90s , 2 45s .
They should have put a set on the pipe . 2 45s on each bank and bury the pipe deep enough to stop erosion . They got lazy . No 90s , 2 45s .