Re: Running Electric

just one more reason to put it in conduit..... when he has to replace it, it will be an easy pull......
 
   / Photo Diary of 1/2 acre pond construction #42  
Re: Running Electric

</font><font color="blue" class="small">( No way will #8 survive very long at 100 Amps. That magic smoke will be released in no time. )</font>

Inspector, what wire would need to be run then?? alum?

gary
 
   / Photo Diary of 1/2 acre pond construction
  • Thread Starter
#43  
Re: Running Electric

My question too! /forums/images/graemlins/confused.gif
 
   / Photo Diary of 1/2 acre pond construction #44  
Re: Running Electric

If you had a full 100 amps of load, which you probably wont, with #2 copper on a 250 foot run you'd have voltage drop of approx 9.4 volts. Aluminum would have a drop 13.6 volts. I think I'd run #2 copper, unless you have a lot of motor loads. Then I'd run #1 copper.
 
   / Photo Diary of 1/2 acre pond construction #45  
Re: Running Electric

In other words, get a pole and transformer from the power company. /forums/images/graemlins/smile.gif

I bet a long run of #2 in conduit would cost more than a hook up!
 
   / Photo Diary of 1/2 acre pond construction #46  
Re: Running Electric

Here in CT, it cost about $3000 per pole to get electric installed unless you are on a street that already has service and the new pole is going to service more people down the road. Private property poles are very expensive.
 
   / Photo Diary of 1/2 acre pond construction #47  
Re: Picture #9: The Stones

I ran copper 3/0 450 feet to my barn for 200 amp service. I bought three 500 foot spools and ran it through 4 inch drain pipe. The hardest part was dealing with the weight of the wire.
 
   / Photo Diary of 1/2 acre pond construction #48  
Re: Running Electric

</font><font color="blue" class="small">( Inspector, what wire would need to be run then?? alum? </font><font color="blue" class="small">(

NiChrome? /forums/images/graemlins/smile.gif
 
   / Photo Diary of 1/2 acre pond construction #49  
Re: Picture #9: The Stones

</font><font color="blue" class="small">( The hardest part was dealing with the weight of the wire. )</font>

I think the hardest part for me would be dealing with the cost.

I lost track of what tools were going to be run off the circuit, but barring over 5000w/ 100a, solar power is very practical for intermittent use. I couldn't be more delighted with my inexpensive little system.
 
   / Photo Diary of 1/2 acre pond construction
  • Thread Starter
#50  
Re: Pond picture update

The weather was beautiful this weekend so I thought I would take a shot of the pond as it currently stands. /forums/images/graemlins/grin.gif
 

Tractor & Equipment Auctions

2016 LOAD MAX 24 GOOSENECK (A52472)
2016 LOAD MAX 24...
2008 Chevrolet Impala 50th Anniversary Sedan (A51694)
2008 Chevrolet...
2018 Lexus IS300 Sedan (A51694)
2018 Lexus IS300...
New Land Honor 3'' Semi-Trash Water Pump (A53002)
New Land Honor 3''...
1990 Ford Ranger Pickup Truck, VIN # 1FTCR11TXLUC19238 (A51572)
1990 Ford Ranger...
Redirective Crash Cushion Guardrail (A51692)
Redirective Crash...
 
Top