Planning to move lots of dirt

   / Planning to move lots of dirt
  • Thread Starter
#31  
Ocaj11

Actually I did leave something out. For the 140K quote I get everything. This includes dirt moving, fine grading, compaction, and gravel roads. The guy for 130K came out and pulled a number out of his head. They didn’t include the gravel roads for this price. The 71K quote does not include gravel roads and fine grading but the gravel is going to cost 15K and I have my JD450H with the automatic blade control to do the finish grading. So actually 71K is really 86K plus some of my time and fuel.

Eric
 
   / Planning to move lots of dirt #32  
That makes sense and sounds like a good price. I'm sure you are relieved. This should allow you to come in way under your original budget. Sounds like you might have a winner there...

Good Luck to you and have fun on the tractor.....
 

Tractor & Equipment Auctions

2018 GMC Sierra 1500 4x4 Crew Cab Pickup Truck (A50323)
2018 GMC Sierra...
GENERATOR HOUSE POEWERED BY TWIN 550HP (60 SERIES)  DETROIT 14.0L ENGINES (A50854)
GENERATOR HOUSE...
PAIR OF 29 FT PIPE RACKS (A50854)
PAIR OF 29 FT PIPE...
2016 KENWORTH T660 SLEEPER (A50854)
2016 KENWORTH T660...
2018 Vermeer D23X30 S3 Navigator Directional Drilling Machine (A49461)
2018 Vermeer...
2001 Great Plains 3N-3010P-4875 Grain Drill (A50657)
2001 Great Plains...
 
Top