Planning to move lots of dirt

   / Planning to move lots of dirt
  • Thread Starter
#31  
Ocaj11

Actually I did leave something out. For the 140K quote I get everything. This includes dirt moving, fine grading, compaction, and gravel roads. The guy for 130K came out and pulled a number out of his head. They didn’t include the gravel roads for this price. The 71K quote does not include gravel roads and fine grading but the gravel is going to cost 15K and I have my JD450H with the automatic blade control to do the finish grading. So actually 71K is really 86K plus some of my time and fuel.

Eric
 
   / Planning to move lots of dirt #32  
That makes sense and sounds like a good price. I'm sure you are relieved. This should allow you to come in way under your original budget. Sounds like you might have a winner there...

Good Luck to you and have fun on the tractor.....
 

Tractor & Equipment Auctions

2019 CATERPILLAR 259D SKID STEER (A51242)
2019 CATERPILLAR...
2009 Lee-Boy 8510HD Conveyer Feed paver (A51039)
2009 Lee-Boy...
2019 FORD F-650 SUPER DUTY BOX TRUCK (A51406)
2019 FORD F-650...
2013 VOLVO VNL860 TANDEM AXLE SLEEPER (A51219)
2013 VOLVO VNL860...
EVERYTHING SOLD AS-IS WHERE IS!! (A50774)
EVERYTHING SOLD...
JCB 505-TC 4x4 Rough Terrain Telehandler (A49461)
JCB 505-TC 4x4...
 
Top