Plot in Lumber trails

/ Plot in Lumber trails
  • Thread Starter
#11  
4 years? not sure I can wait that long....hopefully the tractor will be done soon and once the cuttings are gone I can see what I am dealing with
 
/ Plot in Lumber trails #12  
Rent a Mini-excavator with a thumb, lot smoother than a wheel backhoe and more fun too! . . .John
 

Attachments

  • cat excavator 2.jpg
    cat excavator 2.jpg
    93.7 KB · Views: 309
  • cat excavator 3 .jpg
    cat excavator 3 .jpg
    360.5 KB · Views: 363
  • cat excavator.jpg
    cat excavator.jpg
    101.1 KB · Views: 302
Last edited:
/ Plot in Lumber trails #13  
If it were me I would plant around the stumps and wait for them to rot. Pine stumps usually rot within four years.

They may rot that fast in Missisippi.....but in our sandy soil they will last a long time. Maybe a decade or more. For Pine stumps......grinding is the best way for me...... much faster.......and when your done you dont have stumps to bury or burn or haul. :thumbsup:
 
/ Plot in Lumber trails #14  
If it were me I would plant around the stumps and wait for them to rot. Pine stumps usually rot within four years.
Same here in Florida, termites will see to it, and if you want to speed up the process throw a little dirt on top of the stumps.
 
/ Plot in Lumber trails #15  
Lineman North Florida said:
Same here in Florida, termites will see to it, and if you want to speed up the process throw a little dirt on top of the stumps.

Here you will see what looks like a solid pine stump and its only a shell. You can step on it and the stump will fall apart.
 
/ Plot in Lumber trails #16  
I did that in one of my bottom fields, the problem was the yellow jackets that turned it into a home hated me kicking their roof in. Only stung 3 times, it could have been worse.
 
/ Plot in Lumber trails #17  
I concur with others you can rent a stump grinder and get 20-30 6-12" size in a day maybe more.

Grind them 4-6" below grade then disc the area once you have all the bigger brush cleaned up will level it out and cut up the needles/leftover branches into a finer mulch mixed with the chips. Then a lot of lime some fertilizer and seed of choice.

Depending on your soil if its rocky stumping will leave you with a big mess of roots and rocks to clean up plus I have found 10 years after stumping the ground settles more vs where the stumps were ground down. These were big pine 30-40" across the stump at ground level so when you dig one of these out they are 5-6' in diameter and weigh 1000+lbs due dirt and rocks embedded.
 
/ Plot in Lumber trails #19  
Here's another pic of our trails that wind through the woods....and a rental grinder I used before buying my Woods 3 point grinder. Also a pic of liming my trails / plots.

I paid about $150 per day (plus fuel) to rent the self propelled 25 HP grinders as shown. I could grind up to 200 pine stumps per day with one of these machines. Most of my stumps were sheared off a few inches above ground and were 12 to 14" diameter. Your results may vary. ;)
 

Attachments

  • P1040276 (Medium).JPG
    P1040276 (Medium).JPG
    104.2 KB · Views: 318
  • P1020151(2) (Small).JPG
    P1020151(2) (Small).JPG
    67 KB · Views: 332
  • P1020090(1).jpg
    P1020090(1).jpg
    18.2 KB · Views: 317
/ Plot in Lumber trails
  • Thread Starter
#20  
Your trails look great, exactly what I am going to do. Ginding just seems like such a slow way of going. I have used a similar grinder but it was on some pretty big stumps 30 inch diameter. I have some time coming in March I will have to see about renting one.

Thanks
 

Marketplace Items

Forklift (A56857)
Forklift (A56857)
2023 Caliber Trailers GH840MST 40ft T/A Gooseneck Flatbed Equipment Trailer (A55851)
2023 Caliber...
1970s John Deere 350B Dozer — Only 2,525 Hours — Single Private Owner 40 Years — Light Use, Ready to Work
1970s John Deere...
2007 FREIGHTLINER COLUMBIA 120 (A60736)
2007 FREIGHTLINER...
Bobcat T66 (A60462)
Bobcat T66 (A60462)
SKIDDED WASTE WATER FIBERGLASS TANKS (A60736)
SKIDDED WASTE...
 
Top