Post/Pile Driver

   / Post/Pile Driver #1  

Sysop

Elite Member
Joined
Jun 7, 2013
Messages
3,301
Location
Fairmont, WV
Tractor
Mahindra 4035HST purchased 2013 - Husqvarna TS348-D purchased 2019 - Craftsman 42" HST purchased 2003
This was sent to me as an email, but I found it rather amusing and thought I'd share...

A short video of a Indian pile driving construction technique.
Notice the pile driving only becomes effective when the extra man
jumps on. Very finely tuned! The chant is also catchy!

Now, let's analyze the engineering here:

6 men x 180 lbs = 1080 lbs static force.
Jumping up and down will create a 3 times dynamic effect = 3240 lbs/jump = 1.6 ton thumps.
If the pile is tapered to 2 in x 2 in, cross section at the tip = 4 in 2.
So, dynamic pressure/thump at pile tip = 3240/4 = 800 psi.

"Add a man" feature will increase to 950 psi, so buy the option!
Increase the chant and dynamic force goes up to 5 times to bring max.pressure/thump to 1600 psi for a 7 man team.

Quite good and will penetrate hard clay and sandy soil but not hard rock!
Pretty ingenious.

Click on this for video:

South-Asian construction process


NOTE: The foreman is the guy on the tambourine.
 

Tractor & Equipment Auctions

Montreal ST225/75R15 Trailer Tires (A50322)
Montreal...
New/Unused Fuel Pump with 50ft of Hose (A51573)
New/Unused Fuel...
2006 Audi A6 AWD Sedan (A50324)
2006 Audi A6 AWD...
2003 Ford F-350 Dump , VIN # 1FDWW36P63EC81092 (A51572)
2003 Ford F-350...
2018 Ford F-350 4x4 Crew Cab Pickup Truck (A50323)
2018 Ford F-350...
2016 Ford F-450 Cab and Chassis Truck (A51692)
2016 Ford F-450...
 
Top