Wait a minute guys, you mean i can just let the lumber run and scab the 2x4's together wherever they need to be joined, even if its between the trusses? kinda like plywood sheathing a roof and connecting the sheets with those little connector? I wish i would have known that, i was thinking about that today because i was tired of cutting and waisting so much lumber just to get them to break on the trusses..so how do they need to be scabbed together, just use a short peice of 2x4 underneath the spot where the 2x4's will be joined together, how long should the scab board be and what type and how long do the scres need to be? Is it still good and strong like this, remember, the trusses are on 4' centers..? This sounds like a plan!! Let me know the details! /forums/images/graemlins/laugh.gif