TnT: Kubo ata's vs Integration Engineering, Part 2

   / TnT: Kubo ata's vs Integration Engineering, Part 2 #41  
Re: TnT: Kubo ata\'s vs Integration Engineering, Part 2

Thanks Inspector - that helps me a lot. My top link will go 17-27, but I've never come close to fully extending or retracting it in real use situations. Sounds like that would work. Appreciate the effort. /forums/images/graemlins/smile.gif
 
   / TnT: Kubo ata's vs Integration Engineering, Part 2 #42  
Re: TnT: Kubo ata\'s vs Integration Engineering, Part 2

We have just specially purchased the components for a Top and Tilt system. All the Cylinders have double piloted check valves.
Joy stick control valves with a system. This system is priced 20-50% below systems mentioned on TBN. Due to a special purchase, these systems are in limited quantities.
<font color="blue"> $600 </font>
 
   / TnT: Kubo ata's vs Integration Engineering, Part 2 #43  
Re: TnT: Kubo ata\'s vs Integration Engineering, Part 2

Great price....good luck /forums/images/graemlins/grin.gif
 

Tractor & Equipment Auctions

2009 KUBOTA KX080-3 EXCAVATOR (A50458)
2009 KUBOTA...
2012 Chevrolet Express Van, VIN # 1GCWGFFA0C1114930 (A48836)
2012 Chevrolet...
2016 Ford Explorer AWD SUV (A48082)
2016 Ford Explorer...
New/Unused 36in Mini Skidsteer Smooth Bucket (A48837)
New/Unused 36in...
PALLET OF FLOOR WAX (A50460)
PALLET OF FLOOR...
ICE O MATIC ICE MACHINE (A50460)
ICE O MATIC ICE...
 
Top