TnT: Kubo ata's vs Integration Engineering, Part 2

   / TnT: Kubo ata's vs Integration Engineering, Part 2 #41  
Re: TnT: Kubo ata\'s vs Integration Engineering, Part 2

Thanks Inspector - that helps me a lot. My top link will go 17-27, but I've never come close to fully extending or retracting it in real use situations. Sounds like that would work. Appreciate the effort. /forums/images/graemlins/smile.gif
 
   / TnT: Kubo ata's vs Integration Engineering, Part 2 #42  
Re: TnT: Kubo ata\'s vs Integration Engineering, Part 2

We have just specially purchased the components for a Top and Tilt system. All the Cylinders have double piloted check valves.
Joy stick control valves with a system. This system is priced 20-50% below systems mentioned on TBN. Due to a special purchase, these systems are in limited quantities.
<font color="blue"> $600 </font>
 
   / TnT: Kubo ata's vs Integration Engineering, Part 2 #43  
Re: TnT: Kubo ata\'s vs Integration Engineering, Part 2

Great price....good luck /forums/images/graemlins/grin.gif
 

Tractor & Equipment Auctions

2016 Godwin CD150M 6in Dri-Prime Pump S/A Trailer (A54811)
2016 Godwin CD150M...
2016 Mitsubishi Fuso FEC52S Cab and Chassis Truck (A55852)
2016 Mitsubishi...
1503 (A57192)
1503 (A57192)
2006 INTERNATIONAL 7400 6X4 DUMP TRUCK (A52706)
2006 INTERNATIONAL...
2012 Ram 1500 Crew Cab Pickup Truck (A53422)
2012 Ram 1500 Crew...
Loader Bucket (A53421)
Loader Bucket (A53421)
 
Top