Brick work is finished. The mason will have to come back and add flashing over the basement porch and over the main floor back porch ledger board for the deck.
Tonight I started prep-work for putting in the drain tile for the retaining wall. The holes in the drain tile will be pointed downward when I install the pipes. After the drain tile is in, I can finish the grading so the back porch can be built.
The drain pipe that leads from the basement drain tiles had silt that had backwashed into the drain pipe. The fired construction manager we got rid of had backfilled dirt in a way that silt would just wash into the drain pipe. My wife constructed a U-Turn in the end of a water hose. We pushed the water hose into the drain pipe and flushed the silt out of the drain pipe. I used a flashlight and mirror to check the pipe. The water hose cleaned out the drain pipe very well.
Tonight I started prep-work for putting in the drain tile for the retaining wall. The holes in the drain tile will be pointed downward when I install the pipes. After the drain tile is in, I can finish the grading so the back porch can be built.
The drain pipe that leads from the basement drain tiles had silt that had backwashed into the drain pipe. The fired construction manager we got rid of had backfilled dirt in a way that silt would just wash into the drain pipe. My wife constructed a U-Turn in the end of a water hose. We pushed the water hose into the drain pipe and flushed the silt out of the drain pipe. I used a flashlight and mirror to check the pipe. The water hose cleaned out the drain pipe very well.