So... I am having a new electric service run for my antiquated farmhouse service of 60 amps. The local power company is going to bring in a brand new service from the road to a new 50 kva pad transformer. This will be located behind the existing shop building, and 140ft from the house. From there I am to trench 3ft deep to the house, provide a 4" schedule 40 conduit with a pull rope to a 400 amp meter base that they will provide. Here is my question... How best to do two, 200 amp disconnects from the single meter base? One will run back to the shop and one into the house, both with 200 amp panels. I would prefer to do this on the shop, but the local inspector says no, it must be run to the house first then backtrack to the shop. Can I buy a two pole disconnect with two 200 amp mains or do I do two separate disconnects???