4570Man
Super Star Member
- Joined
- Apr 7, 2015
- Messages
- 18,335
- Location
- Crossville, TN
- Tractor
- Kubota M59, Kubota L3800, Grasshopper 428D, Topkick dump truck, 3500 dump truck, 10 ton trailer, more lighter trailers.
Windmill maker says to bury air lines 6". We've dug out one trench 2x deeper for a 4" drain elsewhere. I'll be running 80' and 120' 1/2" airlines down a mowed 'hill' to shore.
Thanks for the nudge to get/use a pipe layer for my subber. :thumbsup:
btw, IMO it's easy to underestimate what the OP can accomplish. :tractor:
I won’t burry anything 6” deep. It’s too easy to break later. I’ve got a trencher and excavator it goes down 2’ just as good as 6”.