Diggin It
Super Star Member
Well, it's down, in place. Box template worked out OK for the studs. One must have been slightly tilted before the concrete set because it was off just a bit, but not enough to matter. Still thinking about the fascia kit, but I may just caulk around the base for now to help keep small bugs out.
I sloped the pad just slightly for drainage and a 4' level set across the top (under the cover) is less than a half bubble off which is less than I am.
I sloped the pad just slightly for drainage and a 4' level set across the top (under the cover) is less than a half bubble off which is less than I am.