I'm smack in the middle of a drainage project in the backyard. Got a 100' trench dug 2.5' deep. Laying 1 1/2" stone, fabric, more stone, 4" perforated PVC (green stuff), and finally more stone all the way to the surface. Going to leave the stone exposed.
The dirt from the trench I need to move...