CDN Farm Boy
Veteran Member
The REAL secret is to store all of your 3pt implements on moving dollies. You just roll them into place, hook them up, and off you go. Even my 800 pound 6' blower is <3 minutes on or off. No silly quick-hitch required.
And as said earlier, dollies are 100% useless if don't have a concrete floor or very well packed gravel.
$100 for a HF quick hitch wouldn't even cover the cost of a decent dolly or two or ten, never mind the cost of pouring a slab big enough to fit all of them.
Even with a slab to park on, why use a dolly that takes <3 min to hook something up when a QH will have the job done in <30 seconds?