Another Bridge Project

   / Another Bridge Project #21  
Meadowlark,

Great project and congratulations on finishing it so quickly. You must have worked on it every day!!!!

I'm sure the ability to get across it year round was more then worth the $200 you spent on it. hahaha

Eddie
 
   / Another Bridge Project
  • Thread Starter
#22  
Eddie,

Thanks and yes I did work on it every day until completion. The location is very vulnerable to wet conditions and hence my window for getting it done was considered to be very short by me.

Remember, the lumber was all "free"....recycled county bridge lumber. All I had to do was move it to my location, which took two days just in itself. If I hadn't recycled it, it would have just gone to waste.

I really enjoyed the project, in spite of 100 deg. temps most days. It was a real challenge to utilize my equipment efficiently to make up for no other labor help. Time will tell if it holds up or not.
 

Tractor & Equipment Auctions

2017 CATERPILLAR D6N LGP HIGH TRACK CRAWLER DOZER (A60429)
2017 CATERPILLAR...
WOODS 9021 BATWING MOWER (A52707)
WOODS 9021 BATWING...
500BBL WHEELED FRAC TANK (A58214)
500BBL WHEELED...
2014 Chevrolet Silverado 1500 Crew Cab Pickup Truck (A60460)
2014 Chevrolet...
2019 CATERPILLAR 259D SKID STEER (A60429)
2019 CATERPILLAR...
JOHN DEERE 644K WHEEL LOADER (A58214)
JOHN DEERE 644K...
 
Top