Is there anyone who has made this and can report on how well it works? I have scrounged some steel and am trying to find out the best geometry for not lifting too fast vs. getting enough height - as I intend to use it to install/remove engines, among other things, and want fine control.
I assume the one in this diagram pivots where the triangle meets the beam. Others I have seen for sale must require a top link - if I go with a solid unit how short does the top link need to be?
Thanks,
Jim
PS Category one, Ferguson TEA20, only interested in 3 point, no FEL.
PPS whoops blew it on the attachment, meant to provide link instead: Boom pole plan .
I assume the one in this diagram pivots where the triangle meets the beam. Others I have seen for sale must require a top link - if I go with a solid unit how short does the top link need to be?
Thanks,
Jim
PS Category one, Ferguson TEA20, only interested in 3 point, no FEL.
PPS whoops blew it on the attachment, meant to provide link instead: Boom pole plan .