Eddie, the bendable metal frame for the curbing was 40'X6" ( and 8-16" wide).  It took a pallet (42 bags) for each section.   I used many pallets, I lost count, the curbing took 1 bag per foot.  I mixed two bags at a time in my mixer and the 40 foot pour takes 2 hours.     The set up, measuring/framing/leveling, took several days for each 40'.
Kyle, The dog did not behave. I had to put up a temporary fence after each pour. On the last pour she jumped the fence, after I had gone in for the night, and it has about 20 permanent dog paws indentions.
	
		
			
		
		
	
				