Why make it harder than it has to be. Any ol' shmoe can make a slab level if the forms are installed level & set at the right height. Using a transit & following a chalk line takes a higher level of skill altogether, & more time. Just makes no sense to me when it's so easy to have the forms sitting there at the right height to start with.

For starters I answered the question, CORRECTLY.

It is not that difficult and many times it is the fastest and easiest.

Many time we have a edge that goes from say 12' to 23' on the far end. To pour this we use a 24' wall form on edge. Much quicker and easier than trying to match forms to the tapered grade.

Any ol' shmoe can make a slab level if the forms are installed level & set at the right height.

You would think but has been proven to not be true. :laughing:
 

Tractor & Equipment Auctions

2003 Big Tex 10PI 16ft. T/A Pipe Top Utility Trailer (A52377)
2003 Big Tex 10PI...
JOHN DEERE 635F 35' HYDROFLEX PLATFORM HEADER (A51247)
JOHN DEERE 635F...
Year: 2012 Make: Ford Model: Fusion Vehicle Type: Passenger Car Mileage: 61,276 Plate: Body Type: 4 (A50324)
Year: 2012 Make...
2013 Chevrolet Malibu Sedan (A51694)
2013 Chevrolet...
JOHN DEERE 5075E LOT NUMBER 30 (A53084)
JOHN DEERE 5075E...
2020 21" Exmark Push Mower (A52377)
2020 21" Exmark...
 
Top