I was able to get one side of the bridges railings done. I miscalculated the amount of boards I was going to need so I had to mill up more boards. Which I now have to wait until they dry out a bit. Anyway, here are some pics. The first two pics are before I stained them, the second 2 pics are with the 50/50 used oil and diesel mix.

20230919_144951.jpg


20230919_144925.jpg


20230919_162002.jpg


20230919_162016.jpg
 
   / Finally got the bridge started. #24  
Awesome job. Looks great!
 
   / Finally got the bridge started. #25  
Nicely done.
 
   / Finally got the bridge started.
  • Thread Starter
#26  
Thanks for all the replies. I didn’t want to just put up run of the mill balusters to support the handrails. I was looking for something functional and had some character. Also, the wife wanted something to keep the grandkids from falling off. This is what I came up with.
 

Tractor & Equipment Auctions

2019 Allmand Light tower (A49461)
2019 Allmand Light...
2011 Ford Escape XLT SUV (A48082)
2011 Ford Escape...
2023 Chevrolet Tahoe SUV (A48082)
2023 Chevrolet...
8 DRILL COLLAR (A50854)
8 DRILL COLLAR...
2007 Mack CTP713 Granite T/A Roll Off Truck (A48081)
2007 Mack CTP713...
2021 Jeep Grand Cherokee Limited SUV (A48082)
2021 Jeep Grand...
 
Top