Finally got the bridge started.

/ Finally got the bridge started.
  • Thread Starter
#21  
I was able to get one side of the bridges railings done. I miscalculated the amount of boards I was going to need so I had to mill up more boards. Which I now have to wait until they dry out a bit. Anyway, here are some pics. The first two pics are before I stained them, the second 2 pics are with the 50/50 used oil and diesel mix.

20230919_144951.jpg


20230919_144925.jpg


20230919_162002.jpg


20230919_162016.jpg
 
/ Finally got the bridge started. #24  
Awesome job. Looks great!
 
/ Finally got the bridge started.
  • Thread Starter
#26  
Thanks for all the replies. I didn’t want to just put up run of the mill balusters to support the handrails. I was looking for something functional and had some character. Also, the wife wanted something to keep the grandkids from falling off. This is what I came up with.
 

Marketplace Items

UNUSED WOLVERINE TD-13-36R STUMP DIGGER (A62131)
UNUSED WOLVERINE...
2013 Mack CXU613 T/A Day Cab Truck Tractor (A61568)
2013 Mack CXU613...
2005 INTERNATIONAL 4200 24FT BOX TRUCK (A59909)
2005 INTERNATIONAL...
UNUSED IRANCH IRET13 ELECTRIC TRICYCLE (A62130)
UNUSED IRANCH...
8in Channel Tooth Bucket Excavator Attachment (A61567)
8in Channel Tooth...
2014 Toro Z-Master 6000 Series 60in Zero Turn Commercial Mower (A59228)
2014 Toro Z-Master...
 
Top