Finally got the bridge started.

   / Finally got the bridge started.
  • Thread Starter
#21  
I was able to get one side of the bridges railings done. I miscalculated the amount of boards I was going to need so I had to mill up more boards. Which I now have to wait until they dry out a bit. Anyway, here are some pics. The first two pics are before I stained them, the second 2 pics are with the 50/50 used oil and diesel mix.

20230919_144951.jpg


20230919_144925.jpg


20230919_162002.jpg


20230919_162016.jpg
 
   / Finally got the bridge started. #24  
Awesome job. Looks great!
 
   / Finally got the bridge started. #25  
Nicely done.
 
   / Finally got the bridge started.
  • Thread Starter
#26  
Thanks for all the replies. I didn’t want to just put up run of the mill balusters to support the handrails. I was looking for something functional and had some character. Also, the wife wanted something to keep the grandkids from falling off. This is what I came up with.
 

Tractor & Equipment Auctions

2025 Wolverine EX-66-84L Pallet Fork Extensions (A47484)
2025 Wolverine...
2025 Wolverine PT-16-01C 3-Point Quick Hitch (A47484)
2025 Wolverine...
2020 Dodge Grand Caravan SE Minivan (A44572)
2020 Dodge Grand...
2016 Nissan Pathfinder 4WD SUV (A44572)
2016 Nissan...
2020 Ford Explorer XLT SUV (A44572)
2020 Ford Explorer...
2008 TROXELL KILL TRAILER (A45046)
2008 TROXELL KILL...
 
Top