Fired Morton Bldg-Need another builder

   / Fired Morton Bldg-Need another builder #11  
The crew that built my house and shop are booked 2 years out. And worth the wait.
 
   / Fired Morton Bldg-Need another builder #12  
I built my 40x60x14 pole barn while remote (~300 miles, so a bit less than you). I found it very valuable to make local contacts and gain referrals from them. The pole building contractor built for a couple of my contacts, I did all the DWV excavation and plumbing for septic and excavation for water line, electrical contractor was another referral, I did the trenching and conduit for power to meter as well as prepping for the transformer pad, insulation for walls I did myself as well as installing OSB as my finish for walls, ceiling was insulated by another referral, HVAC and plumbing was a DYI job. Inspections were either coordinated by the appropriate contractor or myself, depending.

Needless to say it took me a little over 2 years to get to the almost finished state that I’m at now working on weekends and vacations.
 

Tractor & Equipment Auctions

2023 Kubota Z412KW Zero-Turn Mower with 3-Bag Bagger System (A56436)
2023 Kubota Z412KW...
Michelin CARGOXBIB High Floatation Tires (SET OF 4) (A56436)
Michelin CARGOXBIB...
1983 INTERNATIONAL S SERIES WATER TRUCK (A57192)
1983 INTERNATIONAL...
2021 MacDon FD135 Flex Draper - 35' (A59814)
2021 MacDon FD135...
2007 MACK CTP713 TRI AXLE DUMP TRUCK (A59575)
2007 MACK CTP713...
JOHN DEERE 624K WHEEL LOADER (A58214)
JOHN DEERE 624K...
 
Top