Armedmd
New member
You should be ok with the 59. I’ve loaded my deuce and half with my 7060. You won’t be able to get a heaping load but I don’t think that is what you’re going for anyhow given the weight. You can always push some material from the sides toward the center toward the end of the load. The ramp idea works but it sounds like you would have to build several ramps along the length of the driveway or haul each scoop further as you get away from your ramps which will take more time and burn more fuel. Plus if you’re hiring the truck/driver they’re going to want to be loaded quickly or paid more to sit.